Projects & Case Studies
for Twin Hills Engineering & Drilling
The local specialists in Drilling & Engineering for Sarina, Mackay & surrounding areas.
Twin Hills Engineering & Drilling Projects
Twin Hills Engineering and Drilling (THED) is a drilling and engineering company, specialising in supplying drilling and engineering services to Mackay, Sarina & surrounding areas from our 1600m2 workshop and maintenance facility in Alligator Creek near Sarina QLD.
ERGON ROCKHAMPTON
Required
Drill Earthing holes in solid rock around town buildings.
Challenges
Holes to drilled completely dustless as close to private property and age care residences.
Result
Using Rig 18 , holes where potholed for services using our Vermeer 1000 Vac trailer before crews set up with the self-contained dustless drill rig and completed holes without incident, complaints or dust leaving the site.
PALUMA DAM SPILLWAY
Required
Drill 160 x 3mtr deep 150mm diametre hammer holes thru cement, reo and base rock.
Challenges
Holes to drilled under bridge structure 3 metre maximum height, must be completely dustless as positioned on National park boundary.
Result
Using our Beretta T42 Track rig enabled us to reduce the mast height without modification and using 2 metre hammer rods , rig was connected to our Vermeer 3000 vac unit which collected all the dust and cuttings. All holes were completed on time and under budget with zero incidents.
Get Started
Let us complete your next drilling or earthworks project.
Call for a quote today.